09.10.2015
On 9 October 2015, Budimex signed a contract with the Gdańsk Branch of the General Directorate for National Roads and Motorways for the construction of a 19.1-kilometre section of the S7 expressway from Nowy Dwór Gdański to Kazimierzów. The contract has a net value of PLN 1.3 billion.
The scope of work includes the construction of:
- dual carriageway expressway with a reserve for third lanes,
- access roads, technological roads and detours,
- pedestrian, pedestrian and bicycle routes, bus stops and bays,
- two road junctions: Żuławy East and Elbląg West,
- engineering structures along the S7 expressway (including m.in 10 bridges and two viaducts),
- engineering structures in the line of roads of lower classes (one bridge, 10 viaducts),
- a pedestrian tunnel under the expressway.
The investment also includes the renewal of the pavement on a section of the existing dual carriageway bypass of Nowy Dwór Gdański. The contractor’s tasks include the reconstruction of the S7 expressway in the scope of liquidation of the intersection with ul. Żuławska Street in Elbląg and the construction of a viaduct along this street over the S7 expressway.
Budimex will have 27 months from signing the contract to build the S7 (excluding winter periods from 15 December to 15 March).