The project consisted in the design and construction of the A4 motorway on the section Jarosław junction Wierzbna junction (without the junction) – Radymno (with the junction). We have built 25 km of motorway and the Radymno junction. We have rebuilt the existing roads, engineering structures and installations colliding with the motorway. As part of the investment, we also built 13 motorway viaducts and 10 road viaducts.

In addition, we built Motorway Service Areas (MSAs), a toll collection system (SPO) and a motorway maintenance circuit (OUA). We were also entrusted with the design and construction of the motorway communication and information system, the construction and reconstruction of the network and infrastructure colliding with the motorway, as well as the construction of the sewage system.

Net value: PLN 794 million