The construction of a dual carriageway access road, each 7 m wide, to the bridge crossing in Płock, almost 1.9 km long, was the main element of the project. It was accompanied by the construction of a roundabout with a diameter of 45 m, an intersection with Wyszogrodzka Street, a 512 m long flyover with a composite steel structure, local roads and a ramp for pedestrians and cyclists. The net value of the project is PLN 90 million.