The Arynowo bypass is the main route with a length of 1.9 km, to which service and local roads with a length of 2.8 km have been added. As part of the works, two road viaducts, rainwater drainage, railway equipment and road lighting were also built. The m.in was also rebuilt. overhead power lines, distribution lines and water supply network. The net value of the project was PLN 32 million.