Construction of a ceramic tile production plant including a production hall, specialized tanks and sedimentation tanks, foundations for technological machinery. As part of the works, loading ramps with driveways, internal roads and green areas were also developed. Usable area: 34.8 thousand m2, cubic capacity: 373 thousand m³. The total value of the project amounted to PLN 46.9 million net.