Drogowa Trasa Średnicowa in Zabrze

Construction of the Drogowa Trasa Średnicowa Zachód with a total length of 5.8 km. The project included m.in. roundabout, slip road at the roundabout and ul. Wolności, extension of ul. Gene. de Gaulle, construction of ul. Railway and reconstruction of the tram track. In addition, six viaducts, a railway viaduct and two tunnels were built. The works included: retaining walls, noise barriers, fences and a road culvert. The net value of the project amounted to PLN 273 million.