We have designed and built a reserve-peak boiler room, ensuring full coverage of heat demand during the heating season. The scope of our work included: construction of a 3×30 MW peak-load boiler house and heating water pipeline infrastructure and light oil installation along with the incorporation of the CHP plant into the existing network water system, modernization of the mazut pumping station and adapting it to a new type of fuel (light oil), construction of a 1600 m³ light oil tank with infrastructure, auxiliary system for heating feed water of the existing boilers.

The net value of the project is PLN 27 million.