Expressway S17 Lublin – Piaski
Extension of national road No. 17 on the Lublin – Piaski section to the parameters of an expressway. As part of the investment, the national road No. 17 on the Lublin-Piaski section was also extended to the parameters of an expressway, Projektowana Street and the Świdnik WB junction were built, as well as access roads on both sides of DE S 17. The exit of the national road from Lublin was modernized over a length of 1.7 km, and another 12.1 km was extended to the parameters of an expressway. A new access road to Świdnik and collector roads for local traffic with a total length of 33 km were built. The work also included the construction of 15 engineering structures and the reconstruction of three existing bridges. The value of the investment amounted to PLN 332 million.