Comprehensive adaptation and construction works were carried out in order to adapt the building of the Construction School Complex for the needs of the Integrated Coordination and Response Station m.st. Warsaw. The investment included the reconstruction of the main building, the existing road infrastructure, the utilities network and the change of its shape, in accordance with architectural requirements. As part of the works, a transformer station, a power generator and two chillers were also built, as well as utilities and full installation of teletechnical and ICT networks (in accordance with the standards of “Intelligent Buildings”). The building has 5 floors above ground and one underground. The total area of the facility is 11 thousand. m2. The net value of the project is PLN 26 million.