The purpose of the contract in the “design and build” formula was to build the facilities of the Regional Waste Management Plant and to guarantee the technological parameters of the plant.

– sorting hall with an area of Ok. 3000 m2 equipped with a sorting line for waste segregation with a capacity of 79,000 tons/year, three automatic stations for unloading fractions: 0-80 mm, RDF and ballast.
– a composting plant consisting of 6 bioreactors with an aerobic stabilization capacity of approx. 45 tons/year.
– biofilter to reduce odorization from composting plants.

Also built: sheds for storing recyclable materials, a fire tank. with a capacity of approx. 800 m³, earth tank for leachate, office building, roads, squares, sidewalks and parking spaces. Green areas with an area of approx. 6500 m2 with compensatory plantings.