S7 Ostróda bypass
In June 2017, the Ostróda bypass was handed over to drivers on the Ostróda Północ – Ostróda Południe section, subsection B. As part of the project, Budimex built a nearly 10-km section of the S7 expressway (9.7 km) and a slightly shorter national road DK16 (9 km). In addition, he made m.in. 15 bridge structures, including six of a special structure and one of the record-breaking extradosed structure, with a total span length of 677 m. For the implementation of this project, Budimex received the Top Builder 2018 statuette for the highest quality products and construction solutions, as well as projects in which modern architectural, structural, material and technological solutions were used.