The contract included the construction of the Sucharski Route on the section from the Olszynka junction. It intersects with the following streets: Tama Pędzichowska, Michałki and Elbląska and ends at the bridge over the Martwa Wisła. Two new GP class roadways were built on a section of 3 km, connecting the southern bypass of Gdańsk with Elbląska Street. We built the Błonie junction and rebuilt the Elbląska junction. The task also included the construction of a system of access roads, sidewalks and bicycle paths. Along the new route, we have built a number of engineering structures.

We rebuilt the networks and infrastructure colliding with the new road, water and sewage, heating, gas and energy networks, environmental protection and traffic safety equipment, lighting, and the overhead contact line and PKP networks were rebuilt. We also demolished sections of existing roadways, demolished buildings colliding with the investment and built devices to pre-treat water flowing from the right-of-way.

Net value: PLN 137.1 million