Waste sorting plant in Łódź

The contract concerned the construction of a landfill, construction of transfer stations and a waste sorting plant. The sorting plant is equipped with a modern technological line – a multifunctional installation for segregation of waste from various collection systems with a sorting capacity of 82,500 Mg/year. The sorting hall was made of a steel structure. Hall area: 7.5 thousand m2.