05.02.2013

Mostostal Kraków will build a complex of halls for KGHM Polska Miedź

Share article

The scope of work includes the construction of:
– a multi-bay flash furnace hall with a height of 63 m and a span of 30 m in a steel structure,
– a multi-bay electric furnace hall with a height of 51 m and a span of 30 m in a steel structure,
– a single-aisle waste heat boiler hall with a height of 63 m in a steel structure,
– a 9-storey industrial building (energy and electrical) in a reinforced concrete structure,
– expansion of the anode furnace hall.

The implementation of the investment requires the delivery and installation of 11.2 thousand. tons of steel structures. 1.2 thousand zlotys will be used for the reinforced concrete structure. tons of steel and 11.6 thousand. tons of concrete.

Mostostal Kraków SA – a company from the Budimex SA Capital Group is a specialist construction company offering the execution and assembly of all types of steel structures and the assembly of equipment mainly for the cement and lime, energy, metallurgical and chemical industries. It has its own steel structure factory with the potential to produce o. 500 tons per month, with our own means of transport and specialized assembly equipment. It employs approx. 500 people in Polish.