Protection of the sea shores east of the Port of Darłowo

The investment is located on a section of water reservoir located within the city limits of Darłowo, east of the entrance to the port. The length of the section is 8165 m.
The scope of the investment includes four tasks: 1) Construction of an 830 m long storm embankment, on which an inspection road made of prefabricated road slabs will be placed. 2) Demolition of the existing breakwaters and construction of new ones with a length of 1330 m located at a distance of 100-120 m from the shoreline. Total area The built-ins are approx. 26600 m2. 3) Construction of bank groynes made of wooden piles over a length of about 7 km into the sea. 4) Sapper works. Searching the area, extraction and disposal of hazardous materials and preparing an as-built report, issuing a certificate of cleanliness of the area. The net value of the contract is PLN 87 million.