Construction of a hospital with land development and construction of a helipad. A five-storey, three-storey building with eighteen elevators and two parking lots for a total of 800 cars was built. With 500 beds in sixteen wards, the hospital can see around 30,000 patients per year. An innovative element in the new hospital is the so-called a “hot platform” consisting of: A&E, diagnostic imaging department, operating theatre with 10 rooms, anaesthesiology and intensive care unit. “The hot platform enables quick and collision-free transport of the patient from the Hospital Emergency Department to diagnostics, and then direct transport to the operating theatre. Thanks to this solution, patients of the A&E will be able to be diagnosed and treated immediately after arriving at the hospital. The cubic capacity of the building is 188,200 m³, and the total area is 48,752.67 m2.