The subject of the contract included the expansion of the port infrastructure, i.e. the reconstruction of the existing Zbożowe Quay (its target length is 230 m), enabling an increase in the depth before the construction and increasing the length of the mooring line by extending the quay, and the construction of the German Quay from the north side of the peninsula and a section closing this quay from the east to the junction with the existing Słowackie Quay. The latter is ultimately to serve as a parking quay. The expansion of the infrastructure also included accompanying facilities, which are the equipment of hydrotechnical facilities, such as: extension of tracks, transshipment and railway equipment, construction of road surfaces and underground utilities, as well as dredging works on the basin surrounding the peninsula.

Net value: PLN 27.31 million